Colored waterproof mortar is a flexible waterproof mortar made by mixing modified polymer lotion and cement powder on site, also called polymer cement waterproof coating, referred to as "two-component JS waterproof coating". This product is a green and environmentally friendly product.
LEADINGTECHNOLOGY

Product features

scope of application
Suitable for waterproofing and moisture prevention in basements, bathrooms, kitchens, floors, balconies, roofs, pools, floors, etc.
Construction requirements | 1. During and within two days after construction, the temperature must be above 5 ℃. 2. The surface of the base layer should be treated to be smooth, solid, clean, free from sharp angles, floating dust, oil stains, and visible water. 3. It can be directly constructed on the surface of concrete, with convenient operation and short construction period. |
usage method | 1. When stirring, pour the liquid material into the bucket and use a mixer to stir at low speed, slowly adding the mixed powder. 2. Stir continuously for 5 minutes to ensure even mixing without clumping. Let it stand and mature for 2-3 minutes, then stir thoroughly for another 2-3 minutes before use. 3. After the first coat has hardened, wait for it to completely dry before applying the second coat vertically, with a coating thickness of ≥ 1mm for each coat. |
keep in storage | 1. Store in a ventilated, dark, and dry place with a temperature not lower than 5 ℃, and prevent exposure to sunlight and freezing during transportation. 2. Shelf life of 12 months; The product is non-toxic and non flammable; Storage and transportation can be handled in accordance with the Non Dangerous Goods Regulations. |
Reference dosage | 1 square meter (coated twice, with a coating thickness of about 2mm) requires about 1.4kg, and 1 bucket (coated twice, with a coating thickness of about 2mm) can apply about 13 square meters; The actual consumption varies depending on the flatness of the base layer, coating thickness, and construction method. |
matters needing attention | 1. The construction temperature is between 5 ℃ and 35 ℃, and it is not advisable to carry out construction when there is visible water on the base layer. 2. The mortar should be used up within 30 minutes after preparation. 3. The waterproof coating should be applied after the base layer is solid. 4. Surface decoration construction should only be carried out after the waterproof coating is completely dry. |
1. Convenient construction.
2. High adhesive strength.
3. Excellent adhesion.
4. Has excellent waterproof effect.
5. Technical standards: GB/T23445
6. Environmental standards: JC 1066